Baseline Tank Terminal & Foundations

Voice completed construction of 12 x 400,000 barrel capacity tank foundations complete with geomembrane liner and leak detection systems. This project also included the supply and placement of 125,000 tonnes of gravel to API (American Petroleum Institute) Standards.

VOICE PROVIDED THE FOLLOWING SERVICES DURING THIS PROJECT:

  • Site prep
  • Construction of 12 tank foundation
  • Construction of leak detection systems
  • Supply and placement of gravel

Of the 12 tank foundations constructed, Voice also needed to perform Concrete Deep Soil Mixing (CDSM) on 4 tanks and Mass Soil Mixing (MSM) on 2 tanks. Voice then constructed sub-drain systems to address soil stability concerns due to groundwater levels within the foundation zone. Voice worked closely with Kinder Morgan and other subcontracts to develop an execution strategy that allowed for the construction of all tank foundations within a 12 month duration.