Edmonton Rail Loading Facility

Kinder Morgan Canada’s Edmonton South Rail Terminal is a crude oil loading facility that serves North American markets and refineries through direct connections to the Canadian National and Canadian Pacific railway networks.

VOICE PROVIDED THE FOLLOWING SERVICES DURING THIS PROJECT:

  • Excavation
  • Topsoil stripping
  • Road Construction
  • Rail Construction
  • Construction of ponds
  • Piling
  • Concrete
  • Underground installations
  • Final Grading

Voice completed a $40M scope of work with zero recordable safety incidents. Civil works included excavation, topsoil stripping, road and rail construction, ponds, piling, concrete, underground installations and final grading. Voice worked closely with CN and CP to coordinate their portion of the job, which began operations in 2015.